[主观题]

A Project Status Report would include all of the following except:ACost and schedule repor

A Project Status Report would include all of the following except:

A Cost and schedule reports

B Changes to scope. cost or schedule

C Narrative explanation of variances

D Personnel problems on the project

E Upcoming activities

答案
查看答案
更多“A Project Status Report would include all of the following except:ACost and schedule repor”相关的问题

第1题

The key purpose of project control is to:A.Plan ahead for uncertainties.B.Generate status

The key purpose of project control is to:

A.Plan ahead for uncertainties.

B.Generate status reports.

C.Keep the project on track.

D.Develop the project road map.

E.All of the above.

点击查看答案

第2题

The primary source document for establishing the content of the Project Status Report is:A

The primary source document for establishing the content of the Project Status Report is:

A The project charter

B The Project Plan

C The ASTM Project Document Guide

D The summary work breakdown structure

点击查看答案

第3题

Scope reporting is the timely determination, _____, and _____ of project progress, status
data, and transforming this into structured documentation (reports) necessary to judge project performance (reporting on work packages).

A.Recording, accumulation.

B.Recording, graphical display.

C.Accumulation, graphical display.

D.Graphical display, interpretation.

E.Interpretation, analysis.

点击查看答案

第4题

Amount at Stake is the _____ .Afunction of planned time/real time project costs.Brisk iden

Amount at Stake is the _____ .

A function of planned time/real time project costs.

B risk identified in successful project completions.

C (Standard Project Deviation + Expected Costs)/6

D cost of investment loss + least cost to restore status quo.

E inherent risk at conception altered by standard project deviations.

点击查看答案

第5题

Project life cycles are very useful for _____ and _____ .A.Configuration management, termi

Project life cycles are very useful for _____ and _____ .

A.Configuration management, termination

B.Objective setting, information gathering

C.Standardization, control

D.Configuration management, weekly status updates

E.Approval, termination

点击查看答案

第6题

151Scope reporting is the timely determination, _____, and _____ of project progress, stat

151 Scope reporting is the timely determination, _____, and _____ of project progress, status data, and transforming this into structured documentation (reports) necessary to judge project performance (reporting on work packages).

A. Recording, accumulation.

B. Recording, graphical display.

C. Accumulation, graphical display.

D. Graphical display, interpretation.

E. Interpretation, analysis

点击查看答案

第7题

Going from Level to Level in the work breakdown structure will result inA.Less estimating

Going from Level to Level in the work breakdown structure will result in

A.Less estimating accuracy

B.Better control of the project

C.Lower status reporting costs

D.A greater likelihood that something will fall through the cracks

E.None of the above

点击查看答案

第8题

Risk mitigation is the process of _____ .Atransferring risk to another party.Breducing unc

Risk mitigation is the process of _____ .

A transferring risk to another party.

B reducing uncertainty on the project

C identifying all possible risk events

D monitoring status and making adjustments

E All of the above.

点击查看答案

第9题

Which Low Carbon Technology Is Now a Reality?A.With fossil fuels expected to supply over 7

Which Low Carbon Technology Is Now a Reality?

A.With fossil fuels expected to supply over 70% of the world"s energy needs by 2040, we face some urgent questions: where should efforts be focused in reducing greenhouse gas emissions? Which technologies hold the most promise? There are a range of low-carbon solutions and given the challenge, we will need them all.We hear a lot about the advances being made by refreshable sources of energy such as solar, wind and hydro-electricity and these are certainly valuable technologies in combating climate change.But how can we really make a m jor impact in reducing carbon emissions from large power plants and industrial facilities? Enter carbon capture and storage——or CCS——a technology that captures CO2 from fossil fuel production and permanently stores it underground.

B.The aim is to prevent the release of large quantities of CO2 into the atmosphere (from fossil fuel use in power generation and other industries ).It is a potential means of relieving the contribution of fossil fuel emissions to global warming and ocean acidification (酸化).Although CO2 has been injected into geological formations for several decades for various purposes, including enhanced oil

recovery, the long term storage of CO2 is a relatively new concept.The first commercial example was Weyburn in 2000.CCS can also be used to describe the scrubbing (涤气 ) of CO2 from environmental air as a climate engineering technique.

C.In November 2014 the Global CCS Institute released its flagship (核心的) publication——the annual Global Status of CCS report.This comprehensive annual update is the prominent source of information on the development of CCS around the world.A lot of work went into updating information in the report, in cooperation with the CCS industry, as there had been quite significant changes to the CCS landscape in the preceding 12 months.This included the launch of a large-scale

CCS project in the power sector and the beginning of construction of the world"s first large-scale CCS project in the iron and steel sector.

D.Large-scale CCS is now a reality in the power sector with the October 2014 launch of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project in Saskatchewan, Canada.Boundary Dam is the first commercial CCS plant in the power sector, removing 90 per cent of the CO2 produced by electricity generation from lignite (褐煤) coal at Production Unit No.3 of the SaskPower facility.The captured CO is primarily used for enhanced oil recovery (EOR) at the nearby Weyburn oil field, although amounts are also to be stored in deep geological formations at the Aqnistore site.The success of the Boundary Dam project and the progression of additional

projects through planning and construction, indicates that CCS technologies for application in the power sector are "market ready".

E.The next 18 -24 months will see CCS be applied across a range of industries and storage types.A further two large-scale CCS power projects are in construction in the US——the Kemper County Energy Facility in Mississippi and the Petra Nova Carbon Capture Project in Texas.Both projects are expected to be operational in 2016.Also in the US, the Illinois Industrial CCS project planned for launch later this year will capture CO2 from the Archer Daniels Midland corn-to-ethanol (乙醇) plant in Decatur, Illinois for storage in an onshore deep saline formation.The Abu Dhabi CCS project in the United Arab Emirates is under construction and from 2016 will provide the world"s first large- scale demonstration of CO2 capture from iron and steel production.

F.In addition to the 22 large-scale CCS projects currently in operation or construction around the world,14 projects are in advanced stages of planning, many of which are likely to be in a position to make a final investment decision over the coming year.Together this group of projects covers a range of applications for CCS and could extend to around ten in the number of large-scale CCS projects operating in the power sector by the end of the decade.Their progression to operation would add experience in the dedicated geological storage of CO.and see operational large-scale CCS activity extend to China for the first time.

G.2014 saw commercial application in the power sector become a reality and we can look forward to a further expansion across a diverse range of industries in the coming years.The Global CCS Institute continues to cover developments in CCS with up-to-date information, expert insights, workshops, media releases and online seminars.We struggle to make CCS industry information easily accessible and encourage you to engage with us via our website and regular publications.

H.For detailed information on large-scale CCS projects please visit our online Projects page, which you can browse or search for projects based on stage, region, industry o.r capture, transport and storage type.For the first time the Institute"s website contains project descriptions for around 40 lesser scale "remarkable" CCS projects, of which four Japanese "remarkable" CCS projects were the key focus of a chapter in the Global Status of CCS report.For ongoing expert information visit our Insights page, which is regularly updated with articles from experts in carbon capture and storage, public engagement, legal issues and policy developments.

I.To join in the discussion you can attend meetings and workshops around the world, and participate in online seminars where you will have the opportunity to listen to and ask questions of a range of experts.Visit our Events page to see upcoming meetings, conferences, workshops and seminars.Finally, for a range of up-to-date news and more detailed information, visit our news and publications sections.We look forward to covering this exciting period in the development of CCS and providing you with the latest information and important issues for the sector.

Carbon dioxide has been stored in geological formations for different purposes; however, its long term storage is comparatively new. 查看材料

点击查看答案

第10题

REP是指资源租聘协议。()
点击查看答案
下载APP
关注公众号
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案 购买前请仔细阅读《购买须知》
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《服务协议》《购买须知》
立即支付 系统将自动为您注册账号
已付款,但不能查看答案,请点这里登录即可>>>
请使用微信扫码支付(元)

订单号:

遇到问题请联系在线客服

请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示:请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
请用微信扫码测试
优题宝