题目内容 (请给出正确答案)
[主观题]

Quality control charts show a characteristic of the product or service against:A.the speci

Quality control charts show a characteristic of the product or service against:

A . the specification limits

B . customer requirements

C . control limits based on three standard deviations in each direction

D . control limits based on six standard deviations in each direction

E . A and D only

答案
查看答案
更多“Quality control charts show a characteristic of the product or service against:A.the speci”相关的问题

第1题

(c) (i) Identify and describe FOUR quality control procedures that are applicable to the i

(c) (i) Identify and describe FOUR quality control procedures that are applicable to the individual audit

engagement; and (8 marks)

点击查看答案

第2题

Japanese quality control has improved dramatically in the last 30 years for all of the fol
lowing reasons except:

A . the use of quality circles.

B . small, continuous improvements in quality control.

C . the use of worker suggestion systems.

D . the use of quality control charts.

E . focusing quality control efforts on production outputs.

点击查看答案

第3题

The Work Breakdown Structure (WBS) is the basis for communicating:A.Project scope, cost co

The Work Breakdown Structure (WBS) is the basis for communicating:

A.Project scope, cost control, schedule, quality

B.Project objectives, dependencies, plan, cost control

C.Project scope, schedule, staffing, cost control

D.Project scope, quality, schedule, dependencies

E.Project budget, schedule, risk factors, work assignments.

点击查看答案

第4题

Quality control is normally performed by the _____ .A.QA personnelB.project teamC.operatin

Quality control is normally performed by the _____ .

A . QA personnel

B . project team

C . operating personnel

D . project management

E . None of the above.

点击查看答案

第5题

Scope management is:A.a project control function.B.employs change control.C.a work authori

Scope management is:

A.a project control function.

B.employs change control.

C.a work authorization process.

D.considers Cost, Quality and Schedule.

E.All of the above.

点击查看答案

第6题

在Jabil常用英文术语中,关于QRQC的描述正确的是:()。

A.Quick Response Quick Control快速反馈迅速控制

B.Quick Response Quality Control快速响应品质控制

C.Quality Response Quality Control品质品控系统

D.Quantity Response Quality Control数量反馈品质系统

点击查看答案

第7题

(c) Discuss the quality control issues raised by the audit senior’s comments. (3 marks)

(c) Discuss the quality control issues raised by the audit senior’s comments. (3 marks)

点击查看答案

第8题

5Japanese quality control has improved dramatically in the last 30 years for all of the fo

5 Japanese quality control has improved dramatically in the last 30 years for all of the following reasons except:

A. the use of quality circles.

B. small, continuous improvements in quality control.

C. the use of worker suggestion systems.

D. the use of quality control charts.

E. focusing quality control efforts on production outputs

点击查看答案

第9题

VThe Pareto Principle is a technique used to determine which quality control problems in a
particular process should be corrected. Which of the following statements best represents the philosophy employed by this principle?

A . In order to minimize financial losses from quality control problems, all problems which have a measureable cost should be corrected

B . the majority of defects are caused by a small percentage of the identifiable problems. Improvement efforts should be reserved for these vital problems.

C . in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.

D . generally, 80% of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.

E . A and D

点击查看答案

第10题

In order to achieve long-term quality improvements, management must do the following:A.Mot

In order to achieve long-term quality improvements, management must do the following:

A . Motivate the employees with seminars, contests, and institute programs such as "Quality Improvement' day.

B . Create a quality control department and give the head of the department ultimate responsibility for quality improvement.

C . Implement of a formal quality control program with worker and management involvement.

D . Establish financial incentive packages for worker.

E . A and D

点击查看答案
下载APP
关注公众号
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案 购买前请仔细阅读《购买须知》
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《服务协议》《购买须知》
立即支付 系统将自动为您注册账号
已付款,但不能查看答案,请点这里登录即可>>>
请使用微信扫码支付(元)

订单号:

遇到问题请联系在线客服

请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示:请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
请用微信扫码测试
优题宝