题目内容 (请给出正确答案)
[主观题]

The actual cost of the house was higher than their original ______.A.considerationB.planC.

The actual cost of the house was higher than their original ______.

A.consideration

B.plan

C.judgment

D.estimate

答案
查看答案
更多“The actual cost of the house was higher than their original ______.A.considerationB.planC.”相关的问题

第1题

The actual cost of the building was much higher than our original ______.A.considerationB.

The actual cost of the building was much higher than our original ______.

A.consideration

B.judgment

C.estimate

D.plan

点击查看答案

第2题

The Cost Performance Index is computed as:A.budget cost of work performed divided by actua

The Cost Performance Index is computed as:

A . budget cost of work performed divided by actual cost of work performed

B . budget cost of work performed minus actual cost of work performed

C . budget cost of work performed minus budget cost of work scheduled

D . budget cost of work scheduled divided by budget cost of work performed

E . actual cost of work scheduled divided by budget cost of work performed

点击查看答案

第3题

A budget estimate should give the manager cost data accurate to within:A.-5 to +10 percent

A budget estimate should give the manager cost data accurate to within:

A . -5 to +10 percent of actual cost

B . -25 to +75 percent of actual cost

C . -30 to +75 percent of actual cost

D . -10 to +25 percent of actual cost

E . None of the above

点击查看答案

第4题

听力原文:The cost principle states that assets and services that are acquired should be re
corded at their actual cost.

(7)

A.The cost principle states that assets and services that are acquired should be recorded at their current price.

B.The cost principle states that assets and services that are acquired should be recorded at their actual historical cost.

C.The Reliability Principle states that assets and services that are acquired should be recorded at their current cost.

D.The Reliability Principle states that assets and services that are acquired should be recorded at their actual historical cost.

点击查看答案

第5题

Continually measuring and monitoring the actual cost versus the budget is done to _____.A.

Continually measuring and monitoring the actual cost versus the budget is done to _____.

A.analyze the reasons for variances

B.establish the variances

C.identify the problems

D.All of the above.

E.None of the above.

点击查看答案

第6题

The difference between the BCWS and the BCWP is referred to as the:A.Schedule varianceB.Co

The difference between the BCWS and the BCWP is referred to as the:

A . Schedule variance

B . Cost variance.

C . Estimate of completion

D . Actual cost of the work performed

E . None of the above

点击查看答案

第7题

The budgeted cost of the work performed (BCWP) for a task that has just been completed can

The budgeted cost of the work performed (BCWP) for a task that has just been completed can be calculated by:

A . Multiplying the actual hours worked on the project by the budgeted labor rate.

B . Multiplying the budgeted hours to complete the task by the budgeted labor rate.

C . Dividing the actual hours required to complete the task by the budgeted labor rate.

D . Cannot be determined.

E . None of the above

点击查看答案

第8题

The following statements have been made about the materials mix variance for a company man
ufacturing different products using the same type of material (measured in kgs):

(i) The mix variance can be calculated by taking the difference between the actual quantity in the standard mix and the actual quantity in the actual mix, then multiplying it by the actual cost per kg

(ii) The mix variance arises because there is a difference between what the input should have been for the output achieved and the actual output

Which of the above statements is/are correct?

A.Neither (i) nor (ii)

B.Both (i) and (ii)

C.(i) only

D.(ii) only

点击查看答案

第9题

Chair Co has developed a new type of luxury car seat. The estimated labour time for the fi
rst unit is 12 hours but a learning curve of 75% is expected to apply for the first eight units produced. The cost of labour is $15 per hour. The cost of materials and other variable overheads is expected to total $230 per unit.

Chair Co plans on pricing the seat by adding a 50% mark-up to the total variable cost per seat, with the labour cost being based on the incremental time taken to produce the 8th unit.

Required:

(a) Calculate the price which Chair Co expects to charge for the new seat. Note: The learning index for a 75% learning curve is –0·415. (5 marks)

(b) The first phase of production has now been completed for the new car seat. The first unit actually took 12·5 hours to make and the total time for the first eight units was 34·3 hours, at which point the learning effect came to an end. Chair Co are planning on adjusting the price to reflect the actual time it took to complete the 8th unit.

Required:

(i) Calculate the actual rate of learning and state whether this means that the labour force actually learnt more quickly or less quickly than expected. (3 marks)

(ii) Briefly explain whether the adjusted price charged by Chair Co will be higher or lower than the price you calculated in part (a) above. You are NOT required to calculate the adjusted price. (2 marks)

点击查看答案

第10题

Secure Net (SN) manufacture security cards that restrict access to government owned buildi

Secure Net (SN) manufacture security cards that restrict access to government owned buildings around the world.

The standard cost for the plastic that goes into making a card is $4 per kg and each card uses 40g of plastic after an allowance for waste. In November 100,000 cards were produced and sold by SN and this was well above the budgeted sales of 60,000 cards.

The actual cost of the plastic was $5·25 per kg and the production manager (who is responsible for all buying and production issues) was asked to explain the increase. He said ‘World oil price increases pushed up plastic prices by 20% compared to our budget and I also decided to use a different supplier who promised better quality and increased reliability for a slightly higher price. I know we have overspent but not all the increase in plastic prices is my fault’ The actual usage of plastic per card was 35g per card and again the production manager had an explanation. He said ‘The world-wide standard size for security cards increased by 5% due to a change in the card reader technology, however, our new supplier provided much better quality of plastic and this helped to cut down on the waste.’

SN operates a just in time (JIT) system and hence carries very little inventory.Required:

(a) Calculate the total material price and total material usage variances ignoring any possible planning error in the figures. (4 marks)

(b) Analyse the above total variances into component parts for planning and operational variances in as much detail as the information allows. (8 marks)

(c) Assess the performance of the production manager. (8 marks)

点击查看答案
下载APP
关注公众号
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案 购买前请仔细阅读《购买须知》
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《服务协议》《购买须知》
立即支付 系统将自动为您注册账号
已付款,但不能查看答案,请点这里登录即可>>>
请使用微信扫码支付(元)

订单号:

遇到问题请联系在线客服

请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示:请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
请用微信扫码测试
优题宝